Water Treatment Building Time-Lapse Construction

July 18, 2018
An all-precast concrete 20-ft-by-30-ft water treatment building by Easi-Set Buildings; the wall and roof installation was completed in a period of just three hours. Easi-Set offers standard and custom-specified buildings for water and waste applications across North America.
An all-precast concrete 20-ft-by-30-ft water treatment building by Easi-Set Buildings; the wall and roof installation was completed in a period of just three hours. Easi-Set offers standard and custom-specified buildings for water and waste applications across North America.

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Chemical Plant Case Study

Aug. 14, 2024
Chemical Plant Gets a Fiberglass Conduit Upgrade

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.