Chester, Ill., Keeps Its Head Above Water

Aug. 7, 2018
Mechanical seals on old pumps led to flooding problems at lift station on the Mississippi River

The city of Chester, Ill., was getting only about six months’ life out of the mechanical seals in their former non-clog lift station pumps. While replacing seals twice per year was difficult and expensive, the more serious problem occurred when the seals failed with the Mississippi River at flood stage and with the sealed lift station underwater. The sewage pumps, which handle waste from a large state prison as well as blowdown from the local water plant, would eventually flood the pump station from within because of the seal leakage from failed seals. The cost of replacing flooded motors and controls would be clearly unacceptable.

Vaughan Co.'s sales representative, Municipal Equipment, proposed a solution in June 2005 to replace the original non-clog pumps with 2 Vaughan 6-in. discharge pedestal chopper pumps using Vaughan's more durable flushless cartridge mechanical seal. To save the city money, Vaughan Co. designed a custom motor mounting stool to accommodate the existing dual speed 75/33-hp, 1750/1170-rpm motors. Vaughan Co.'s chopper pumps were able to provide the same performance as the original non-clog pumps while also providing Vaughan's chopping capability with no power requirement penalty.

To make this change the city sent one motor at a time to Vaughan Co. while one pump stayed in service. By late 2005, both Vaughan chopper pumps had been installed and started up.

After more than five years, not one mechanical seal has required any attention in either of these pumps. This kind of service suggests that the robustness built into the Vaughan flushless cartridge seal is paying real dividends to the city of Chester. The plant superintendent, Kenny Surmann, is also sleeping much better at night now, especially when the Mississippi floods its banks. "It's great not having to pull pumps and change seals every six months. And it's real peace of mind when the river is up and the station is underwater."

Since these pumps went into service, the city of Chester has purchased additional Vaughan chopper pumps.

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Chemical Plant Case Study

Aug. 14, 2024
Chemical Plant Gets a Fiberglass Conduit Upgrade

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.