2013 Design-Build for Water/Wastewater Conference

March 20, 2013 - March 22, 2013

Location: Orlando, FL

The American Water Works Ass.n reports that ensuring safe drinking water for current and future populations will cost at least $1 trillion over the next 25 years, with similar levels of expenditures necessary to meet wastewater demands. The solutions, when they come, will inevitably involve design-build. Both the time and the cost savings associated with design-build are key to meeting these crucial infrastructure needs. Be a part of the solution: Register to attend the 2013 Water/Wastewater Conference.

Visit the conference's website for more information.

Sponsored Recommendations

Get Utility Project Solutions

June 13, 2024
Lightweight, durable fiberglass conduit provides engineering benefits, performance and drives savings for successful utility project outcomes.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Meeting the Demands of Wastewater Treatment Plants

May 24, 2024
KAESER understands the important requirements wastewater treatment plant designers and operators consider when evaluating and selecting blowers and compressed air equipment. In...

Modernize OT Cybersecurity to Mitigate Risk

April 25, 2024
Rockwell Automation supports industry-leading Consumer Packaged Goods company, Church & Dwight, along their industrial cybersecurity journey.