CH2M Design-Build Partner for Projects in Texas, California

May 26, 2016
CH2M will work on a Houston water purification plant expansion, San Jose's Cogeneration Facility Project

The City of Houston, Texas, and the City of San Jose, Calif., each selected CH2M as its design-build partner for a major water project—the $1.2 billion Northeast Water Purification Plant Expansion (NEWPP) project and the $85 million Cogeneration Facility Project, respectively.

“As one of the founding members of the Water Design-Build Council (WDBC), CH2M is an industry leader in alternative delivery methods, including design-build, where we have successfully leveraged our technology and process innovations, as well as our relationships, to deliver solutions for our water clients, including Pima County, Ariz.; Spokane County, Wash.; Woodland-Davis, Calif.; and others,” said Global Water Business Group President Peter Nicol. “Utilizing alternative delivery methods saves time, reduces cost and improves project coordination to ensure process needs, budget and schedule requirements are met and risks associated with the project are managed.”

Building upon lessons learned from major design-build projects, the NEWPP project, which is the largest progressive design-build project of its kind in the nation, will be delivered over the next nine years by the Houston Waterworks Team, a joint venture between CH2M and CDM Smith. The Houston Waterworks Team is responsible for designing and constructing a new water facility, as well as start-up, commissioning and operating activities. By offering integrated design, construction and operating capabilities, the team will help the city of Houston save nearly $9 million in operations and maintenance costs related to power, chemicals and residuals disposal. The project includes expanding the city of Houston’s existing NEWPP from 80 to 320 mgd through two construction phases, while ensuring high water quality and production rates to meet regional surface water conversion mandates.

“For more than 40 years, we have successfully delivered the largest water treatment plants in Texas, many for the city of Houston,” added Nicol. “We are proud to continue our delivery partnership with the city to meet the future water needs of the greater Houston area with the NEWPP project.”

Additionally, CH2M is serving as Design-Builder for the new Cogeneration Facility at the San José Santa Clara Regional Wastewater Facility. The Cogeneration Facility will provide reliable on-site power and heat, replacing aging cogeneration equipment at the wastewater facility that has been subject to breakdowns of increasing frequency and severity. This project is also being delivered using a progressive design-build approach and consists of advanced generation internal combustion engines selected based on their low capital cost, high electrical efficiency and availability of high-grade heat for the anaerobic digestion tanks. New engines will be incorporated to meet projected power demands, allowing for the largest advanced wastewater facility in the western United States to clean wastewater for the San Francisco South Bay uninterrupted; thereby continuing to protect public health, the environment and support Silicon Valley businesses. The engines will maximize the use of available digester gas, blended with natural gas, to generate and meet on-site power requirements with future potential of using additional available landfill gas. The Cogeneration Facility project scope includes a new digester gas treatment system, control system and monitoring system with connectivity to the wastewater facility’s distributed control system, electrical switchgear, various additional appurtenances in support of the engines and building, a new digester gas pipeline and natural gas pipeline, new heat recovery systems, and civil work including parking areas and utilities.

Source: CH2M

Sponsored Recommendations

Get Utility Project Solutions

June 13, 2024
Lightweight, durable fiberglass conduit provides engineering benefits, performance and drives savings for successful utility project outcomes.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Meeting the Demands of Wastewater Treatment Plants

May 24, 2024
KAESER understands the important requirements wastewater treatment plant designers and operators consider when evaluating and selecting blowers and compressed air equipment. In...

Modernize OT Cybersecurity to Mitigate Risk

April 25, 2024
Rockwell Automation supports industry-leading Consumer Packaged Goods company, Church & Dwight, along their industrial cybersecurity journey.