The Ozark Point Water Treatment Plant has served Little Rock, Arkansas, atop a hill overlooking the city since the 1880s. The age raised concerns over the health of the concrete for the flocculation and sedimentation basins, one of which dates back to original construction and the second of which dates back to the late 1920s.
Tad Bohannan, CEO of Central Arkansas Water, explains why retaining the historic look of facility was important for the community. Tom Crowley, project manager for Carollo Engineers, discusses the challenges involved with updating a more than 140-year-old, including space limitation and bringing the plant up to code.
Additional Resources
- Subscribe to the Water & Wastes Digest Youtube Channel: https://www.youtube.com/channel/UCHr1xfvaq8Uy7en7e9l2XKA?sub_confirmation=1
- Watch our last video: https://www.wwdmag.com/pipe-distribution/collection-systems/video/21545829/detroits-major-sewer-interceptor-connecting-tunnel-2022-wwd-top-projects
- Read about the Ozark WTP: https://www.wwdmag.com/water-treatment/article/21439189/ozark-point-water-treatment-plant
- View the WWD Weekly Digest playlist: https://youtube.com/playlist?list=PLt9dEooEKNn3YgbfScyaPJHrXg50-eAb8
Timestamps
- Intro | 0:00
- Community served by Ozark Point WTP | 0:56
- Reasons for the project | 3:55
- Challenges due to the age of the facility | 5:18
- Evaluating best filter upgrades | 8:16
- Maintaining historic look and feel | 10:59
- ADA access for public tours | 14:43
- Outro | 15:15
Sign up for More Water & Wastes Digest Content
- Subscribe to Water & Wastes Digest: https://sgc.dragonforms.com/WWD_new&PK=SMNN2020
- Renew your WWD subscription: https://sgc.dragonforms.com/WWD_renew&PK=SMRE2020
- Sign up to our newsletter: https://www.wwdmag.com/manage-subscription?source=video2020
Connect with WWD on Social Media
- Facebook: fb.com/waterwastesdigest
- Twitter: http://www.twitter.com/wwdmag
- LinkedIn: linkedin.com/company/waterwastesdigest
Sponsored Recommendations
Sponsored Recommendations
Chemical Plant Case Study
Aug. 14, 2024
Energy Efficient System Design for WWTPs
May 24, 2024