Kenosha Water Utility Energy Optimization Resource Recovery Project

April 7, 2022
1655328683916 Case Study Kenosha Optimization 800x534

The Kenosha Water Utility elected to use a design-build approach due to the complex and varied technologies associated with this project. Centrisys/CNP served as the design-build developer. The project delivered a cost-effective and eco-friendly solution to biosolids handling, processing and disposal. This design integrated equipment and processes never used in North America, while incorporating the technologies into existing buildings and a 1980s infrastructure.

Editor's Note: Scranton Gillette Communications and the SGC Water Group are not liable for the accuracy, efficacy and validity of the claims made in this piece. The views expressed in this content do not reflect the position of the editorial teams of Water & Wastes Digest, Water Quality Products and Storm Water Solutions.