Narragansett Bay Commission’s Field’s Point Integrated Fixed-Film Activated Sludge System

Dec. 9, 2016

Cost: $31 million
Location: Providence, R.I.
Year: 2015-04-15
Size: 65 mgd
Owner: Narragansett Bay Commission
Designers: Kleinfelder
Contractor: Daniel O’Connell’s Sons, Kruger

In 2003, Narragansett Bay in Provi-dence, R.I., experienced a fish kill that resulted in the death of more than one million fish. Following this event, the Narragansett Bay Commission (NBC) was required to upgrade its two wastewater treatment facilities to meet and exceed a newly imposed permit limit of 5 mg/L total nitrogen.

At the Field’s Point facility, Rhode Island’s largest sewage treatment plant, the commission selected a four-stage integrated fixed-film activated sludge (IFAS) floating media system—a technology that, at the time, was primarily used in small- to mid-sized municipal wastewater treatment facilities. 

Because of space constraints on the 22-acre site, NBC was unable to build additional treatment tanks. Instead, it decided to convert existing aeration tanks to enhance the IFAS technology, creating the largest IFAS system in the world. To achieve a system of this size, NBC evaluated 24 treatment technologies.

During the design phase, the team had to consider the plant’s adaptability to northern climate temperatures; ability to treat the highly variable flows of a combined sewage system; flexibility to alter the system if lower permits are issued in the future; and capacity to accommodate the flow from the existing facility as well as future expansion.

During construction, each of the aeration tanks had to be individually converted to the IFAS system while remaining in compliance with existing permit limits with significantly reduced aeration capacity. The system successfully remained in compliance throughout the process. 

Since starting up in May 2014, the system has effectively reduced total nitrogen concentrations in the upper bay. The plant achieved a seasonal average of 3.4 mg/L total nitrogen in 2014—an 82% reduction from the 2003 fish kill.

“The project is fully operational and exceeding our expectations,” said Raymond J. Marshall, P.E., executive director of NBC. “The technology is always popular with visitors who tour the facility, and we are seeing healthier marine populations in the upper bay.” 

Project Year: 2015-04-15Contractor: Daniel O’Connell’s Sons, KrugerDesigners: KleinfelderOwner: Narragansett Bay CommissionLocation: Providence, R.I.Cost: $31 millionSize: 65 mgd

Sponsored Recommendations

Get Utility Project Solutions

June 13, 2024
Lightweight, durable fiberglass conduit provides engineering benefits, performance and drives savings for successful utility project outcomes.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Meeting the Demands of Wastewater Treatment Plants

May 24, 2024
KAESER understands the important requirements wastewater treatment plant designers and operators consider when evaluating and selecting blowers and compressed air equipment. In...

Modernize OT Cybersecurity to Mitigate Risk

April 25, 2024
Rockwell Automation supports industry-leading Consumer Packaged Goods company, Church & Dwight, along their industrial cybersecurity journey.