ABB Introduces Drive Exchange Service Offering to Minimize Unplanned Downtime

June 30, 2021

Exchange service offering enables end users to get up and running rapidly

ABB’s Drives Service team reduces the impact of unplanned downtime with the Drive Exchange Service offering. Utilizing real-time inventory and a dedicated Exchange program team, ABB can ship a replacement unit within 24 hours of a purchase order receipt. The ABB Drives Exchange Service offering is an extension of the Expanded Drives Services offering which includes reconditioning service, preventive maintenance, and standard or premium repair, all of which are performed at ABB’s state-of-the-art, ISO certified Drives Service Workshop in New, Berlin, Wisconsin. All drives are repaired by ABB certified technicians using genuine ABB parts to ensure the drive operates as designed. All work performed is factory tested and backed by at least a one-year warranty.

All ABB Drives Exchange units will have a 1-year complete drive warranty from date of shipment from ABB. “We know that for a customer who is down, every minute is a loss of productivity and profit, possibly even raw materials,” explains Michelle Schwery, Director of Sales and marketing – US Drives Service. “The goal of the Exchange service offering is to get them up and running quickly.”

ABB Drives Service also offers on-site assistance and training through a nation-wide network of field service technicians. All of this is backed by 24/7 customer service and technical support.

Editor's Note: Scranton Gillette Communications and the SGC Water Group are not liable for the accuracy, efficacy and validity of the claims made in this piece. The views expressed in this content do not reflect the position of the editorial teams of Water & Wastes Digest, Water Quality Products and Storm Water Solutions.

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Chemical Plant Case Study

Aug. 14, 2024
Chemical Plant Gets a Fiberglass Conduit Upgrade

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.
ABB_Logo_Screen_RGB_25px_@2x
Directory

ABB Drives

May 25, 2021