Vorelodos Aerobic Digester, Reduces Nutrient Return and Improves Energy Efficiency.

April 5, 2022

Results from Green Lake, Wisconsin.

Faced with rising operational costs due to increasing energy and chemical prices, as well as stricter effluent permit limits, many operators and engineers are turning to performance optimizers and controls automation to enhance treatment processes and reduce operating costs while limiting capital expenses. 

To overcome these challenges, an advanced process control solution was implemented in an aerobic digester in Green Lake, Wisconsin. By controlling the process in a smarter way, the solution significantly reduced phosphorus and nitrogen in the returns to the main treatment process and reduced energy consumption and wear on the blower.

Plant data

The 14 month-long study was conducted at the City of Green Lake wastewater treatment plant in Wisconsin that uses a continuous feed ICEAS advanced SBR system (average flow = 0.2 MGD) with Vorelodos aerobic digester.

The digester includes fine bubble diffusers, positive displacement blowers, and a manual telescoping valve for decanting. Digester solids are sent to a belt filter press for dewatering and ultimately land application.

The Vorelodos digester system has four zones operating in series, two in the east digester and two in the west digester. Waste activated sludge is automatically pumped from the ICEAS system into the east digester approximately every two hours. The supernatant from the digester is returned to the SBR through the telescoping valve and is manually initiated four days per week. A sludge pump is used to remove sludge from the west digester once per week.

During the study, YSI sensors measuring NH4, NO3, K, DO and ORP were installed in the east and west digesters. Additionally, a YSI orthophosphate (PO4) analyzer (P700 model) was installed in the east digester.

OSCAR optimizer and DINO controller

The aerobic digester was upgraded with an OSCAR process performance optimizer with DINO controller, which automatically adjusts the required aeration time in the digester based on potassium readings. The DINO controller alternates aerobic, anoxic and anaerobic conditions in the digester to optimize total nitrogen and phosphorus treatment while minimizing energy consumption.

Result: improved nutrient removal and energy savings

The OSCAR control system with DINO controller enabled biological phosphorus removal in the digester reducing PO4 returned to the main plant more than 90 percent on average. Figure 1 illustrates an aerobic period where soluble PO4 decreased more than 95 percent, resulting in a significant reduction in the amount of phosphorus returned to the ICEAS process via decant or solids dewatering. These improvements reduced chemical consumption in the main treatment process by more than 50 percent while still meeting the effluent phosphorus permit.

Conclusions

Results from tests carried out between January 2016 and March 2017 showed that upgrading the plant’s existing aerobic digester to a Vorelodos system with OSCAR optimizer and DINO controller, enhanced performance by reducing nutrients (nitrogen and phosphorous) that were returned to the main treatment process by more than 90 percent and lowering energy consumption by more than 95 percent.

Glen McCarty, Director of Public Works, Green Lake Wastewater Treatment Plant, said, “Permitted levels of nitrogen and phosphorus in effluent water are becoming ever stricter in an effort to protect surface waters from eutrophication. At the same time, plants are required to reduce energy and chemical consumption and are often challenged with limited time and staff. Sanitaire Vorelodos enabled us to do more with less.”

Editor's Note: Scranton Gillette Communications and the SGC Water Group are not liable for the accuracy, efficacy and validity of the claims made in this piece. The views expressed in this content do not reflect the position of the editorial teams of Water & Wastes Digest, Water Quality Products and Storm Water Solutions.

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Chemical Plant Case Study

Aug. 14, 2024
Chemical Plant Gets a Fiberglass Conduit Upgrade

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.