EPA Calls for Granite Rock to Improve Oil Spill Prevention

Dec. 27, 2017
New settlement comes in the wake of Clean Water Act violations

The U.S. Environmental Protection Agency (EPA) has reached a settlement with Granite Rock Co. over Clean Water Act violations at three of its road materials manufacturing and recycling facilities in Northern California. The agreement requires the company to pay a $102,051 penalty to address storm water discharge violations at two of its Redwood City facilities and oil pollution prevention violations at a facility in Aromas. Granite Rock will also complete a watershed cleanup project as part of the settlement.

“The waterways of San Francisco Bay and the Monterey Peninsula are important to the region’s unique ecology and economy,” said Alexis Strauss, acting regional administrator for EPA’s Pacific Southwest Region. “It is critical for industrial facilities to control stormwater runoff and prevent oil spills, given the potential to harm precious water resources and wildlife.”

As part of the agreement, Granite Rock will also complete a Supplemental Environmental Project, removing 800 cu yd of trash and debris from the Coyote Creek and Pajaro River watersheds. The project, which will be completed by October 2019 and cost almost $78,000, will remove contaminants and improve habitat for anadromous fish, including endangered steelhead trout.

An EPA inspection, conducted in partnership with the San Francisco Bay Regional Water Quality Control Board, found that Granite Rock’s Peninsula Road Materials and Peninsula Recycling Services facilities failed to use best management practices—such as routinely sweeping paved surfaces and using covered storage areas for potential pollutants—to reduce or eliminate pollutants in stormwater runoff. In addition to the settlement announced today, EPA previously ordered Granite Rock to improve storm water controls at the Redwood City facilities and to redirect storm water flows to an active treatment system that will remove pollutants prior to discharge. These changes will be in place by July 1, 2018.

The settlement also resolves Granite Rock’s violations of the Oil Pollution Act’s Spill Prevention, Control, and Countermeasure requirements at its A.R. Wilson Road Materials facility in Aromas. In response to EPA’s inspection, the company has cleaned up all petroleum product leaks and spills at the facility, installed additional secondary containment around petroleum product storage tanks, and conducted tank integrity testing.

Sponsored Recommendations

Get Utility Project Solutions

June 13, 2024
Lightweight, durable fiberglass conduit provides engineering benefits, performance and drives savings for successful utility project outcomes.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Meeting the Demands of Wastewater Treatment Plants

May 24, 2024
KAESER understands the important requirements wastewater treatment plant designers and operators consider when evaluating and selecting blowers and compressed air equipment. In...

Modernize OT Cybersecurity to Mitigate Risk

April 25, 2024
Rockwell Automation supports industry-leading Consumer Packaged Goods company, Church & Dwight, along their industrial cybersecurity journey.