Asphalt Company Fails to Protect River from Runoff

April 16, 2020

An asphalt manufacturing facility in Washington, D.C., has agreed to actions to protect the Anacostia River from polluted storm water runoff

The U.S. EPA announced that Roubin & Janeiro, Inc., owner of an asphalt manufacturing facility in Washington, D.C., has agreed to actions to protect the Anacostia River from polluted storm water runoff.

The EPA cited the company for: failing to take required measures to reduce pollution discharges, including failing to minimize exposure of material storage areas to storm water runoff; failing to properly store solid waste debris; failing to minimize potential for leaks and spills; and failing to prepare an adequate site map in the facility’s Storm Water Pollution Prevention Plan.

This citation came from a joint inspection by EPA and the D.C. Department of Energy and the Environment (DOEE).

The company will implement measures to reduce polluted runoff including: construction of aggregate containment structures; construction of a vehicle pollutant containment structure; updating the site map and storm water pollution prevention training protocol; updating site inspection schedules and processes; and updating its pollution prevention plan.

These measures are intended to minimize the flow of asphalt manufacturing related storm water pollutants to the Anacostia River, according to the agency.

While the company agreed to the consent order, it neither admitted nor denied the factual allegations or liability for the alleged violations.

“Uncontrolled storm water runoff from industrial and construction sites often contains oil and grease, chemicals, nutrients and oxygen‑demanding compounds and other pollutants,” said the EPA. “The Clean Water Act requires owners of certain industrial and construction operations to obtain a permit before discharging storm water runoff into waterways. These permits include pollution-reducing ‘best management practices,’ such as spill prevention safeguards, material storage and coverage requirements, runoff reduction measures, and employee training.”

Read related content about industrial water & storm water pollution:

About the Author

Cristina Tuser

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Chemical Plant Case Study

Aug. 14, 2024
Chemical Plant Gets a Fiberglass Conduit Upgrade

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.