JWC Environmental

Santa Ana, US 92705

COMPANY OVERVIEW

About JWC Environmental

Contact


Santa Ana, US 92705
http://www.jwce.com
949.833.3888
949.833.8858

More Info on JWC Environmental

1655771936819 Jwclogo062718

Advanced sewage treatment equipment is of vital and growing importance to the world. JWC Environmental is a leading manufacturer of equipment for wastewater treatment, solids reduction, solids removal and processing. The Monster family of products—including the Muffin Monster and Channel Monster sewage grinders, Auger Monster fine screen, Screenings Washer Monster and Monster Separation System—is legendary for quality and reliability, incorporating a fine screen or band screen with superior screenings conditioning. Our superior technology provides solutions for the most demanding applications, including sludge grinders, shredders, screens, washer compactors and septage receiving stations.

Products & Press Releases

WWD Enews Top Content 090621
Collection Systems

Monster Stack™ - The Right Cutter at the Right Location

Sept. 7, 2021
Since materials in the waste stream vary, grinders often must address multiple challenges from the bottom to the top of the grinder. JWC grinders use individual cutters so you...
Chain-Rake_250x250 032221 (1)
Wastewater Treatment

Chain & Rake Monster®

March 22, 2021
JWC’s Chain & Rake Monster® is a highly efficient, continuously raked bar screen for coarse screen water treatment needs at headworks, pump stations and storm overflows. Its robust...
jwc-washer-compactor-092617
Wastewater Treatment

Washer Compactor

Nov. 12, 2019
The Monster Wash Press (MWP) cleans and compacts the discharge from headworks screens, separating water and organics from the solids. It features a Muffin Monster grinder to preconditio...
jwc-grinder-110218
Collection Systems

Wastewater Grinders

July 9, 2019
The Channel Monster Flex is the newest addition to JWC Environmental’s family of grinder products for shredding tough solids to protect downstream pumps, pipes and other equipment...
jwc-rotary-drum-screens-083018
Wastewater Treatment

Rotary Drum Screens

Jan. 21, 2019
JWC’s IPEC internally fed rotary drum screens have offered solids recovery in industrial wastewater applications for nearly 40 years. They are used in a variety of food and beverage...
JWC PS Muffin
Utility Management

Sewage Grinders

Aug. 16, 2018
The patented Muffin Monster design has established new standards in product performance and reliability due to decades of technical advancements and innovative design improvements...
JWC PS 10K
Utility Management

Sewage Grinder

Aug. 16, 2018
The 10K Series Muffin Monster offers superior waste-grinding capabilities in a compact, easy-to-install unit that is suited to a variety of wastewater grinding applications. This...
JWC_WEB
Sludge & Biosolids

Septage Receiving System

Aug. 16, 2018
The SRS-XE is an improvement to the award-winning Honey Monster. This automated septage receiving system uses a combination of grinding, solids removal, washing and dewatering...
jwc
Directory

Screenings Washers

Aug. 16, 2018
Screenings Washer Monsters provide a cost-effective solution for compaction and dewatering of wastewater screening. Models of the washers include the SWM-XE, the SWM-XEM and the...
Auger-Monster-AGV-site
Wastewater Treatment

Screen

Aug. 16, 2018
Auger Monster model AGV safely and easily screens, cleans and conveys rags and debris straight up and out of the sewer system. This gives collection system managers an affordable...

Articles & News

Monster_Stack_030722
Collection Systems

Monster Stack™ - The Right Cutter at the Right Location

Feb. 24, 2022
JWC grinders use individual cutters so you can mix and match cutter types in a Monster Stack™ to address multiple challenges in the waste stream.
MM Install List-min
Collection Systems

Reducing Emergency Sewer Repairs From Ragging & Clogging

Sept. 10, 2021
Pump station solution addresses wipes, rags, clothing, rocks, wood, plastics and other non-dispersible debris
Reclaimed_water_pumps 030821
Collection Systems

Upgrade of Channel Monster® Cuts Wipes Problem and $78k From Electrical Bill

March 5, 2021
Water District’s upgrade to JWC’s Channel Monster® with Wipes Ready solves pump clogging problems.
water-treatment-2717001_1920
Wastewater Treatment

Headworks: Removing Inorganics and Preventing Wear

Oct. 20, 2020
This article details headworks designs and shows how the system fits into the scheme of the wastewater treatment process
10000-10K-Muffin-Monster
Case Studies

Muffin Monster Takes Over When Macerator Can’t Cut It

Nov. 18, 2019
For many years, a water reclamation plant in Texas successfully used six Penn Valley double disc pumps for their primary sludge and scum applications. At their latest expansion...
Monster-Drum-Thickener_IFT (1)
Sludge & Biosolids

Durango Foils Energy Heist & Lowers Maintenance Costs

Sept. 13, 2019
Durango WWTP commissioned a JWC Environmental IFT 3648 Monster Drum Thickener in June 2006.
JWC_Wonderland-Pump-Station_02
Collection Systems

Cutting Down on Reweaving of Flushable Wipes

June 19, 2019
Ontario pumping station upgrades to new technology to combat problems caused by flushable products
JWCE_CMF_Separated
Collection Systems

Wastewater Sewage Grinder

June 3, 2019
About the author: JWC Environmental can be reached at www.jwce.com or 800.331.2277. The Channel Monster Flex (CMF) is the newest addition to JWC Environmental’s wastewater sewage...
DAF 3
Top Projects

iWWD - Unipres

Dec. 12, 2018
Cost: $250,000 to $300,000Location: Portland, Tenn.Year: 2018-12-01Size: 17 gpmOwner: UnipresDesigners: FRC & Hanka Associated LLCContractor: ARMI ContractorsIn 2017, Unipres ...
JWC CS Mosside Scotland
Case Studies

Shredding Solids in Scotland

Aug. 16, 2018
Mosside pump station uses rotating drum screens to tackle clogging problems

Videos & Resources

JWC logo 2
Home

No Match for These Monsters: Technology for Eliminating the Wipes Nightmare

Aug. 16, 2018
The composition of modern sewage is vastly different than influent from just a few decades ago, and pump stations, headworks facilities and other equipment within water resource...
Muffin Monster logo smaller
Home

How to Right-Size Wastewater Headworks Screening for Smaller Plants

Aug. 8, 2018
There is not a one-size-fits-all solution that can be applied to every headworks situation. Matching the needs of the facility to the appropriate screening equipment is vital ...

Request More Information

By clicking above, I acknowledge and agree to Endeavor Business Media’s Terms of Service and to Endeavor Business Media's use of my contact information to communicate with me about offerings by Endeavor, its brands, affiliates and/or third-party partners, consistent with Endeavor's Privacy Policy. In addition, I understand that my personal information will be shared with any sponsor(s) of the resource, so they can contact me directly about their products or services. Please refer to the privacy policies of such sponsor(s) for more details on how your information will be used by them. You may unsubscribe at any time.

All content from JWC Environmental

JWC PS IFT
Sludge & Biosolids

Rotary Drum Sludge Thickener

Aug. 16, 2018
Wastewater treatment plants are trying to find ways to reuse their valuable sludge through anaerobic digestion, as well as lower their overall carbon footprint. The Monster Rotary...
JWC CS Las Vegas NV
Case Studies

Pump Maintenance Eliminated at Apartment Complex Lift Station

Aug. 16, 2018
New approach eliminates lift station pump clogs at 400-unit apartment complex
JWC CS Catalonia Spain
Case Studies

Protecting PC Pumps in Spanish Biogas Plant

Aug. 16, 2018
Facility adds grinder to extend stator life
2_30
Collection Systems

Open-Channel Grinder

Aug. 16, 2018
The powerful Channel Monster grinder is equipped with new Delta P side rails and drives trash, rags and waste debris into the cutter stack while maintaining high flow. The durable...
mbr_rs
Collection Systems

MBR Screen

Aug. 10, 2018
The Bandscreen Monster screens wastewater to remove problem solids, provide complete protection for membrane bioreactors and meet the manufacturer’s warranty requirements. The...
JWC CS Pilot Flying J
Case Studies

Manhole Helps Keep Trucks Rolling & Sewage Flowing

Aug. 10, 2018
Built-in grinder helps reduce troublesome solids
JWC_Finescreen-System
Utility Management

Finescreen System

Aug. 8, 2018
The Finescreen Monster removes unwanted rags and trash before they cause problems inside a wastewater treatment plant. It uses moving perforated panels with 3-mm circular openings...
JWC CS Santa Margarita CA
Case Studies

Down to Size

Aug. 8, 2018
Grinder cuts $78,000 from energy costs in Santa Margarita (Calif.) Water District
JWC PS Wipes Ready 2
Collection Systems

Wipes Ready Grinders

Aug. 6, 2018
Use new Wipes Ready technology at your facilities and lift stations to prevent rag-ball removals, pump clogs and damage dollars. Wipes-ready technology optimizes wipes capture...